Skip to content
Projects Training Software Contact Get a Quote
Offshore platforms beyond breaking waves

Subsea design

Ras Markaz Crude Oil Park On-Bottom Stability

On-bottom stability analysis of the subsea pipelines for Phase 1 of the Ras Markaz Crude Oil Park.

Client
Ras Markaz Crude Oil Park Project (Phase 1)
Our role
On-bottom stability analysis
Location
Oman
Category
Subsea design

We carried out the on-bottom stability analysis for Phase 1 of the Ras Markaz Crude Oil Park project, confirming the pipelines remain stable under wave and current loading during installation, testing and operation.

Planning something similar?

We’d be glad to talk through the engineering challenges.

Call Email Get a Quote